![]() |
Daily Tenders™ - Leads 2 Business™ Call us on +27(0)860 836 337 |
|
| 07 January 2009 | ||
PRO FORMA
ALTERATIONS BY TENDERER
Shou1d the Tenderer desire to make any departures from or modifications to the General Conditions of Contract, the Special
Conditions of Contract, Specifications, Schedule of Quantities or Drawings, or to qualify his tender in any way, he shall set
out his proposals clearly hereunder or alternatively state them in a covering letter attached to his tender and referred to
hereunder, failing which the tender wi1l be deemed to be unqualified.
| PAGE | CLAUSE OR ITEM |
|
|
Signature of Tenderer ..............................................................
Date.....................................................
© Copyright 1990 by the South African Institution of Civil Engineering. ® All rights reserved